The Capricorn Beach Foreshore development will bring a new lease of life to a very popular beach that has been a favourite spot of the Yanchep locals over many years. Ultimately it will see the transformation of 12 hectares of beachfront land into a stunning lifestyle destination with parklands, tourism resort, cafés and restaurants and a range of residential housing.
The Capricorn Beach Foreshore will feature beautiful landscaped parklands with children’s adventure play areas, a universal access path to the stunning protected beach, as well as retaining the closest carpark to the beach along the northern corridor.
The foreshore development has commenced and access to the beach along Capricorn Esplanade is now accessible to local traffic. Stage one of the redevelopment not only includes access to the upgraded lower beachfront carpark but an array of other facilities are coming including playgrounds, BBQ’s, picnic shelters, beach shower and much more – you can find out more by clicking the stages below to see what is coming next.
New beachfront park with large open grass area for picnics and play, new trees for shade and sensitive coastal planting on retained dunes.
Extension of Capricorn Esplanade and upgrade of the lower foreshore carpark.
Beach access footpaths, 450m extension of foreshore footpath to the north.
Picnic shelters with BBQ facilities with seating areas.
Pedestrian friendly plaza with brickpaved road, wide footpaths with feature seating areas and large shady street trees.
Children’s play area including a flying-saucer basket swing, see-saw and feature boat and cubby in sand play area.
Extension of coastal planting areas, pathways and viewing decks, feature seating areas, bike racks, lighting and much more.
Extension of Capricorn Esplanade through to Two Rocks Road including walking and cycle path and street trees.
A new 75 bay car park off the Beachfront Plaza will provide access for families to the Foreshore playgrounds and beach access.
Architect designed facility nestled into the existing coastal dune for public amenities, with surf lifesaving storage facilities.
Timber deck path to a new beach access at the north end of Foreshore.
Play equipment including a play tower with dual tunnel slides, dancing snake swing and angled climbing net.
The current private driveway from the Two Rocks Road roundabout to the Capricorn Beach Foreshore area will remain closed through to approximately Q2 2023 to facilitate the construction of the new entry to the foreshore area.
The road closure will be in place to enable the complete upgrade of this private access road to a fully compliant public road.
Access to the Capricorn Beach Foreshore and Lower beachfront carpark is available now via the new extension of Capricorn Esplanade completed as part of Stage 1 of the Capricorn Beach Foreshore works.